How to move strategies from Build->Retest->Improve->Optimize?
3件の返信
Newbie, so may be a dumb question – How do i move strategies from Build->Retest->Improve->Optimize? I have to save 200 strategies to a folder from Build tab and re-load in Retest tab .. but, there’s got to be a more elegant way of doing this?
0
こんにちは
from build:
mark all the strategies and then press Retest button. SQ will ask you if you would like to move the strategies to retets and if you wish to transfer the setting.
to optimize/improve strategy you have to upload the strategy from folder, but in retest and build is ussually many strategies so it has no sense to move them to optimize, because you optimize or improve the strategies one by one. thats wh there is not button move to optimize/improve.
0
How do i load a strategy in the Improve Tab? I tried Load Strategy but it loads it in Retest tab, and Improve tab is not aware of the loaded strategy.
0
you have to save the strategy first, and than go to Improve section and There is: Strategy to improve………………..Load, so press Load
(not load strategy)
0
3件の返信を表示中 - 1 - 3件目 (全3件中)